Project:
Site Closure of two releases from USTs

 

 


DESCRIPTION:


 

 

USTs had been removed from this site [circa 1990].  A small oil containing UST was later discovered in 1992 and closed in place.  Other Consultants had performed work  at the site. One release from a small oil tank, was inside the building and the second release was just north of the building on the subject site. Obtained Closure on the 1992 release. Unable to close second release because migration was going into street. Client selected to discontinue efforts on project.

Duration:     

7 Months

Completed Projects:
•  Remediation Project •  Environmental Site Assesment •  UST Removal •  System Design •  Site Closure •  Baseline Environmental Assessment •  UST Release Closure •  Removal of Unregulated tanks •  Legal Involvement •  UST Involvement •  Subsurface Investigation •  Oversight Management •  Subsurface Investigation •  LUST Closure  •  Subsurface Investigation •  Super Fund Project •  Site Assessment •  UST Removal •  UST Involvement •  Baseline Environmental Assessment •  UST Involvement •  Consulting Institutional Controls •  Subsurface Investigation •  Sampling •  Identification of Location of UST •  UST Release Closure •  UST Closure •  Removal Oversight •  Site Closure •  Environmental Site Assessment •  Phase I ESA •  ESA for a Marina •  Limited Subsurface Investigation •  Residential Apartment Complex •  REC Evaluations •  Bulk/Commercial Fueling Station