Project:
LUST Closure
|
Closure of Confirmed Release |
DESCRIPTION:
 |
Closure of confirmed release on
subject property. Delineated site with respect to extent of
contamination and any migration. Designed sampling and analysis
plan and implemented to determine extent of contamination
vertically as well as horizontally and if plume had migrated off
site. Assessed potential exposure pathways to utility corridors
and/or volatization from soil/groundwater into building
pathways. Managed all aspects of the project and other
professionals and all laborers involved in the project.
Characterized soils and prepared boring logs. Performed
corrective action activities. Determined t free product was not
present. Performed site assessment activities including initial
assessment report, final assessment report, classified site,
performed tiered evaluations and identified clean up goals in
accord with RBCA; Remediated approximately 22 cubic yards of
soil and properly disposed off site. Closed LUST and Certified
Closure.
|
Duration:
|
4 Months |
Completed Projects:
•
Remediation Project •
Environmental Site Assesment •
UST Removal •
System Design •
Site Closure •
Baseline Environmental Assessment •
UST Release Closure •
Removal of Unregulated tanks •
Legal Involvement •
UST Involvement •
Subsurface Investigation •
Oversight Management •
Subsurface Investigation •
LUST Closure •
Subsurface Investigation •
Super Fund Project •
Site Assessment •
UST Removal •
UST Involvement •
Baseline Environmental Assessment •
UST Involvement •
Consulting Institutional Controls •
Subsurface Investigation •
Sampling •
Identification of Location of UST •
UST Release Closure •
UST Closure •
Removal Oversight •
Site Closure •
Environmental Site Assessment •
Phase I ESA •
ESA for a Marina •
Limited Subsurface Investigation •
Residential Apartment Complex •
REC Evaluations •
Bulk/Commercial Fueling Station |