Project:
UST Involvement
Oversight Management and Sampling
|
UST Removal and Part 213 Work |
DESCRIPTION:
|
Tank removal
and sample collection. A contractor, retained directly by the
owner, removed UST systems from two excavation cavities which
formerly contained gasoline Had oversight management over the
independently retained UST removal contractor. Contacted MISS
DIG to identify subsurface appurtenances. Prepared a HASP for
all activities on the site. Because the entire floor of one
excavation cavity was covered by water, collected a single water
sample from floor of that cavity; Collected two soil samples -
one from each end of the floor of the second cavity. Submitted
samples to a qualified laboratory for analysis. Upon receipt of
results, prepared the notice of confirmed release for client to
submit to MDEQ
|
Duration:
|
1 Month |
Completed Projects:
•
Remediation Project •
Environmental Site Assesment •
UST Removal •
System Design •
Site Closure •
Baseline Environmental Assessment •
UST Release Closure •
Removal of Unregulated tanks •
Legal Involvement •
UST Involvement •
Subsurface Investigation •
Oversight Management •
Subsurface Investigation •
LUST Closure •
Subsurface Investigation •
Super Fund Project •
Site Assessment •
UST Removal •
UST Involvement •
Baseline Environmental Assessment •
UST Involvement •
Consulting Institutional Controls •
Subsurface Investigation •
Sampling •
Identification of Location of UST •
UST Release Closure •
UST Closure •
Removal Oversight •
Site Closure •
Environmental Site Assessment •
Phase I ESA •
ESA for a Marina •
Limited Subsurface Investigation •
Residential Apartment Complex •
REC Evaluations •
Bulk/Commercial Fueling Station |