Project: UST Involvement
Oversight Management and Sampling
 

UST Removal and Part 213 Work 

DESCRIPTION:


 

Tank removal and sample collection.  A contractor, retained directly by the owner, removed UST systems from two excavation cavities which formerly contained gasoline Had oversight management over the independently retained UST removal contractor. Contacted MISS DIG to identify subsurface appurtenances. Prepared a HASP for all activities on the site.  Because the entire floor of one excavation cavity was covered by water, collected a single water sample from floor of that cavity; Collected two  soil samples - one from each end of the floor of the second cavity. Submitted samples to a qualified laboratory for analysis.  Upon receipt of results,  prepared the notice of confirmed release for client to submit to MDEQ

Duration:     

1 Month

Completed Projects:
•  Remediation Project •  Environmental Site Assesment •  UST Removal •  System Design •  Site Closure •  Baseline Environmental Assessment •  UST Release Closure •  Removal of Unregulated tanks •  Legal Involvement •  UST Involvement •  Subsurface Investigation •  Oversight Management •  Subsurface Investigation •  LUST Closure  •  Subsurface Investigation •  Super Fund Project •  Site Assessment •  UST Removal •  UST Involvement •  Baseline Environmental Assessment •  UST Involvement •  Consulting Institutional Controls •  Subsurface Investigation •  Sampling •  Identification of Location of UST •  UST Release Closure •  UST Closure •  Removal Oversight •  Site Closure •  Environmental Site Assessment •  Phase I ESA •  ESA for a Marina •  Limited Subsurface Investigation •  Residential Apartment Complex •  REC Evaluations •  Bulk/Commercial Fueling Station