Home | UST Services | Wetlands | Standard Practices | Projects | News | Alternative Energy | Contact Us |

  


 ECI Environmental Consultants
& Engineers, LLC



Qualified UST Consultant


Building a Better Way



 

Project:  UST Removal Oversight.
 

UST Involvement  Facility #  0-005980
 

DESCRIPTION:

Oversight Manager and Supervisor of removal and disposal of three 8,000 gallon USTs previously containing gasoline. Prepared HASP for all activities. Obtained all permits and prepared all notifications.  Supervised washing and rinsing of tanks and containerized washings for disposal.  Directed and supervised the emptying, removal, and disposal of all piping, vent pipes, feed lines, etc.  Collected samples from floors (front and back) of cavity and submitted, along with trip blank, to qualified laboratory under chain of custody for analyses of gasoline parameters. All samples maintained at 40C in cooler.  Evaluated lab results and advised client as to status of site and made recommendations.  Filed release report and recommended Assessment Report followed by Closure Report. There was no migration off site. 

 

Duration:     

1 Month

Completed Projects:
•  Remediation Project •  Environmental Site Assesment •  UST Removal •  System Design •  Site Closure •  Baseline Environmental Assessment •  UST Release Closure •  Removal of Unregulated tanks •  Legal Involvement •  UST Involvement •  Subsurface Investigation •  Oversight Management •  Subsurface Investigation •  LUST Closure  •  Subsurface Investigation •  Super Fund Project •  Site Assessment •  UST Removal •  UST Involvement •  Baseline Environmental Assessment •  UST Involvement •  Consulting Institutional Controls •  Subsurface Investigation •  Sampling •  Identification of Location of UST •  UST Release Closure •  UST Closure •  Removal Oversight •  Site Closure •  Environmental Site Assessment •  Phase I ESA •  ESA for a Marina •  Limited Subsurface Investigation •  Residential Apartment Complex •  REC Evaluations •  Bulk/Commercial Fueling Station