Project:
UST Involvement. ASTM 1903
Subsurface Investigation and BEA |
Site Assessment
Subsurface Investigation |
DESCRIPTION:
 |
In accord with ASTM 1903
performed a site assessment prior to performing IAR and Closure.
The site was a former AMOCO gasoline station. The current owner
had never operated the site as a gas station and was now selling
the property. Retained by the new purchaser. New purchaser
wanted a site assessment performed on the property and if
contamination was found, a BEA to protect him from liability as
the new purchaser. Performed a visual survey of the site,
contacted AMOCO to obtain as much information as possible and
performed a due diligence on the site in order to design a scope
of work for subsurface investigation. Designed and implemented a
scope of work to address the client’s objectives. Engaged MISS
DIG to demarcate utilities and prepared a HASP. Advanced soil
borings, collected samples and properly prepared them with
appropriate preservatives and maintained cool (<4 degrees
Centigrade), and submitted them, along with a trip blank, for
analysis under chain of custody to an independent qualified
laboratory. Prepared site diagrams to scale and included all
structural features. Characterized the soils and prepared boring
logs. Assessed the data in accord with RBCA and MDEQ Criteria
and determined viability of potential exposure pathways.
Suggested that the client notify the property owner that a
confirmed release should be filed with MDEQ based on the
analytical data obtained. Prepared BEA. |
Duration:
|
3 Months |
Completed Projects:
•
Remediation Project •
Environmental Site Assesment •
UST Removal •
System Design •
Site Closure •
Baseline Environmental Assessment •
UST Release Closure •
Removal of Unregulated tanks •
Legal Involvement •
UST Involvement •
Subsurface Investigation •
Oversight Management •
Subsurface Investigation •
LUST Closure •
Subsurface Investigation •
Super Fund Project •
Site Assessment •
UST Removal •
UST Involvement •
Baseline Environmental Assessment •
UST Involvement •
Consulting Institutional Controls •
Subsurface Investigation •
Sampling •
Identification of Location of UST •
UST Release Closure •
UST Closure •
Removal Oversight •
Site Closure •
Environmental Site Assessment •
Phase I ESA •
ESA for a Marina •
Limited Subsurface Investigation •
Residential Apartment Complex •
REC Evaluations •
Bulk/Commercial Fueling Station |